Train performance figures

Our performance in figures​

We report the proportion of trains that arrive to the minute at each station on the timetable, where technology allows.

Our performance figures show how punctually our trains are reaching stations, from ‘early’ through to ‘30 minutes after’ the timetable stated. We also report the Public Performance Measurement of the number of trains reaching their final destination 'on time'. We show how many trains ran with fewer seats than planned, and how many were delayed or cancelled. Results are based on actual performance over the past four weeks compared to the published timetable.

All figures below are for East Midlands Railway, 2026, Period 2702.

New industry measure

Early32.90%
On time56.70%
Within 3 mins75.10%
Within 5 mins83.40%
Within 10 mins91.90%
Within 15 mins95.20%
15+ mins4.80%
20+ mins3.10%
30+ mins1.40%
Cancelled5.96%

Short formations

Trains running with fewer carriages than planned.

Route/number of trainsLondon routeLiverpool - NorwichLocal routesOverall
Number of trains 17 110
% of total trains1.28%1.77%0.44%0.89%

Cancellations and delays

Trains delayed between 30-59 minutes

Route/number of trainsLondon routeLiverpool - NorwichLocal routesOverall
Number of trains 4726210
% of total trains2.69%4.90%0.41%1.69%

Trains delayed between 60-119 minutes

Route/number of trainsLondon routeLiverpool - NorwichLocal routesOverall
Number of trains2212135
% of total trains0.43%1.25%0.02%0.28%

Trains delayed over 120 minutes

Route/number of trainsLondon routeLiverpool - NorwichLocal routesOverall
Number of trains3003
% of total trains0.06%0.00%0.00%0.02%

Percentage of cancelled trains

London routeLiverpool-NorwichLocal routesOverall
7.21%7.63%4.63%6.0